Day 6: Today we begin our ascent towards the Interim Camp at approximately 5,800 m.
Day 7: We continue our ascent to Advanced Base Camp (ABC), situated at approximately 6,400 m.
Day 8: A rest and acclimatization day at Advanced Base Camp. This day allows the team to recover while further adapting to the increasing altitude.
Day 9: Ascent to the North Col (approx. 7,000 m). Today we ascend via a steep glacier section towards the North Col to reach Camp 1.
Day 10: After spending the night at the North Col, we continue our ascent along the North Ridge towards Camp 2 at 7,800 m.
Day 11: Today we make our next push to Camp 3, the highest camp on the route, situated at 8.300 m.
Day 12: Summit day begins early. From Camp 3, we initially ascend towards the North Ridge. We then traverse the North Face below the ridge before rejoining the ridge further on. From here, we encounter the technically demanding sections of the route, including the 1st, 2nd and 3rd Steps, which are secured with fixed ropes. After the 3rd Step, the route continues over the comparatively straightforward summit slope towards the summit of Mount Everest (8,849 m). After reaching the summit, we begin our descent on the same day. Our goal is to descend directly to Camp 2.
Day 13: Today we continue our descent to Everest Base Camp. After the hopefully successful summit of Mount Everest, we return to the comfort of Base Camp and enjoy a well-deserved meal.
Day 14:We leave Everest Base Camp and begin our journey back towards civilization.